TSP: 872670161 TSP Name: ENABLE GAS TRANSMISSION, LLC Critical Notice Description: Not a critical notice Notice Effective Date: 09/12/2024 Notice Effective Time: 10:00 Notice End Date: 00/00/0000 Notice End Time: 00:00 Notice Identifier: 5777 Notice Status Description: Initiate Notice Type: Planned Service Outage Posting Date/Time: 09/12/2024 09:49 Required Response Indicator Description: No response required Response Date: Response Time: Subject: PLANNED SERVICE OUTAGES Notice Text: Revision Start Date End Date Prev Start DaPrev End Date Line / Facility Pooling Area Line Maintenance Potentia l Imp N 10/4/2023 TBD Line BT-1 / BT-1AN North Line BT-1 Isolation for line repairs 7 N 9/10/2024 9/16/2024 Ruston Storage South Line F DOT Shutdowns, Station ESD, Bypass panel install, Annual Maintenace 7 N 9/10/2024 9/11/2024 Delhi Station South Line FM-63 Semi-annual maintenance 8 N 9/10/2024 9/16/2024 Malvern Station Nuetral Line AC Unit 1 maintnenance items 1 N 9/11/2024 9/11/2024 Line O (Red Oak to Dunn) North Line O Cleaning pig / ILI prep 7 N 9/18/2024 9/19/2024 Perryville Station South Line F Turbine Semi Annual Maintenance 7 N 9/24/2024 9/25/2024 Allen Station Nuetral Line AD Lighting Project 7 N 9/25/2024 10/4/2024 Line K South South Line K South Hydro Testing 8 N 9/30/2024 10/10/2024 Line 4-1-4 West Line 4-1-4 Integrity Digs (6) 3 N 10/2/2024 10/2/2024 Dunn Station North Line J Station ESD 6 N 10/7/2024 10/24/2024 Line O (Red Oak to Dunn) North Line O ILI Project (Cleaning and MFL / EMAT runs 7 N 10/12/2024 10/23/2024 Line OM-1 North Line OM-1 Integrity digs / pipe replacement 8 N 10/14/2024 10/28/2024 Chandler Station West Line AD Semi Annual Maintenance Unit 3 1 N 10/17/2024 10/17/2024 Amber Station West Line AD Station ESD 6 N 10/14/2024 10/18/2024 Chiles Dome Storage West Line 2AD EOS Fall Shut In 3 N 10/21/2024 11/1/2024 Ada Stoage West Line AD EOS Fall Shut In 3 N 10/28/2024 11/1/2024 Hinton Station West Line AD Cooler Installation Project 7 N 10/29/2024 11/5/2024 Allen Station Nuetral Line AD Unit Replacement 7 N 11/5/2024 11/6/2024 Hinton Station West Line AD Semi Annual Maintenance 6 N 11/18/2024 11/22/2024 Waskom Plant South Line F-185 Plant Outage 8 1. No capacity impact is expected at this time. 2. Coordinating with necessary loads. 3. Based on historical and current throughput, no capacity impact is expected. In the event nominations increase significantly, restrictions may become necessary. 4. Coordinating maintenance with interconnecting pipe to minimize customer impact. No capacity impact is expected at this time; however, if operating conditions change, affected parties will be notified. 5. Affected production notified of shut-in during work. 6. Customers may experience pressure fluctuations, but no capacity impact is anticipated. 7. Based upon customer nominations, restrictions may become necessary. 8. Based on all available information, capacity will be impacted. Capacity reductions will be done in accordance with the provisions of EGT's tariff regarding scheduling and interruption of services. O/A or News 5669/5670 5738 46646 N/A N/A 5748 5747 5753 N/A N/A TBD Required N/A N/A 5770 5771 Required 5747 N/A Required For a more readable version of this document click Here